1. Which of the below is not a filler material in filler slabs?

Correct Answer is : Rubber pieces

2. Rat-trap bond masonry requires _________ less mortar.

Correct Answer is : 0.4

3. For natural and cost-effective ventilation, ________ can be used.

Correct Answer is : Brick jali

4. By using filler slab technique:

Correct Answer is : Aesthetic ceiling is obtained

5. Economy can be achieved in doors, windows, ventilator by:

Correct Answer is : Steel frames