Skip to main content
Loading
SnapRecruit
Log in
VIEW SIMILAR JOBS →
loadingbar
Loading, Please wait..!!

Construction Scheduling & Project Controls Expert (Expert Witness Consulting)

  • Posted on: Nov 27, 2026
  • Structural Forensic Experts
  • Remote (US)
  • Salary: $150 per hour
  • Full-time

Job Title :

Construction Scheduling & Project Controls Expert (Expert Witness Consulting)

Job Type :

Full-Time

Job Location :

Remote (United States)

Remote :

Yes

Job Description :

Job Description
Construction Scheduling & Project Controls Expert (Expert Witness Consulting)


Part-Time-Remote-$150-$250/hour




Structural Forensic Experts is seeking highly qualified Construction Scheduling & Project Controls Experts to assist with complex construction disputes involving schedule delays, productivity losses, disruption, acceleration, and other project impacts. This is an opportunity to work on high-profile litigation and dispute resolution matters as part of an experienced expert witness consulting team.




Types of Projects


Our experts evaluate projects across a wide range of construction sectors, including:



Commercial, industrial, institutional, and residential construction


Highways, roadways, airports, and transportation infrastructure


Utility construction


Water, wastewater, and stormwater systems


Bridges and marine structures


Public and private capital improvement projects

About the Role


This is not a traditional project management or scheduling position.


Instead, you will analyze completed and ongoing construction projects to determine the cause of schedule impacts, critical path changes, productivity loss, and/or acceleration. Your work will support attorneys, owners, contractors, and other stakeholders in resolving complex construction disputes.

Responsibilities may include



Reviewing CPM schedules, contract documents, project records, and correspondence


Performing forensic schedule and delay analyses


Evaluating critical path impacts and productivity losses


Conducting project site inspections when necessary


Preparing written expert reports


Assisting with mediation, arbitration, and litigation


Providing deposition and trial testimony when required





Preferred Locations


We are currently seeking experts located in:



North Carolina


Virginia


Louisiana (New Orleans area)


South Florida (Miami, Fort Lauderdale, West Palm Beach, Orlando, and Tampa)





About Our Firm


Our firm provides expert consulting services throughout the United States on matters involving construction delay & disruption, construction defects, professional practice and damages.


Our professionals support attorneys, contractors, owners, public agencies and other stakeholders in some of the nation's most challenging construction disputes. Team members are located across the country and generally work remotely from their home offices with occasional travel for site inspections, meetings, depositions, and testimony.

Qualifications


Qualified candidates should possess:



Bachelor’s degree in Engineering, Construction Management, Construction Engineering, or a related discipline


20+ years of experience in construction scheduling and project controls


Extensive experience developing and managing Critical Path Method (CPM) schedules


Advanced proficiency with Primavera P6

Experience performing forensic schedule analysis, delay analysis, time impact analysis, and productivity assessments


Strong technical writing and communication skills


Expert witness, deposition, or trial testimony experience is preferred but not required


Professional certifications such as PSP, PMI-SP, PMP, PE, or CCM are a plus





Compensation


This is an independent contractor position.


Compensation ranges from $150 to $250 per hour, depending on qualifications, experience, and project requirements.




Travel


Occasional travel may be required for:



Site inspections


Client meetings


Depositions


Mediation and arbitration


Trial testimony





If you are a seasoned scheduling or project controls professional seeking intellectually challenging work that leverages your technical expertise, we'd welcome the opportunity to speak with you.

Curious about compensation?

Explore the historical salary trends, average pay, and estimated compensation for Construction Scheduling & Project Controls Expert (Expert Witness Consulting) roles in nationwide.

View Salary Guide →

Position Details

Posted:

Nov 27, 2026

Reference Number:

4d7039491e0534fa

Employment:

Full-time

Salary:

$150 per hour

City:

Remote

Share this job:

Verified active listing · Free for job seekers · Direct or verified partner apply · How SnapRecruit verifies jobs

Construction Scheduling & Project Controls Expert (Expert Witness Consulting)    Apply

Click on the below icons to share this job to Linkedin, Twitter!

Job Description Construction Scheduling & Project Controls Expert (Expert Witness Consulting) \n Part-Time-Remote-$150-$250/hour \n \n Structural Forensic Experts is seeking highly qualified Construction Scheduling & Project Controls Experts to assist with complex construction disputes involving schedule delays, productivity losses, disruption, acceleration, and other project impacts. This is an opportunity to work on high-profile litigation and dispute resolution matters as part of an experienced expert witness consulting team. \n \n Types of Projects \n Our experts evaluate projects across a wide range of construction sectors, including: \n \n Commercial, industrial, institutional, and residential construction \n Highways, roadways, airports, and transportation infrastructure \n Utility construction \n Water, wastewater, and stormwater systems \n Bridges and marine structures \n Public and private capital improvement projects \n \n \n About the Role \n This is not a traditional project management or scheduling position. \n Instead, you will analyze completed and ongoing construction projects to determine the cause of schedule impacts, critical path changes, productivity loss, and/or acceleration. Your work will support attorneys, owners, contractors, and other stakeholders in resolving complex construction disputes. \n \n Responsibilities may include \n \n Reviewing CPM schedules, contract documents, project records, and correspondence \n Performing forensic schedule and delay analyses \n Evaluating critical path impacts and productivity losses \n Conducting project site inspections when necessary \n Preparing written expert reports \n Assisting with mediation, arbitration, and litigation \n Providing deposition and trial testimony when required \n \n \n Preferred Locations \n We are currently seeking experts located in: \n \n North Carolina \n Virginia \n Louisiana (New Orleans area) \n South Florida (Miami, Fort Lauderdale, West Palm Beach, Orlando, and Tampa) \n \n \n About Our Firm \n Our firm provides expert consulting services throughout the United States on matters involving construction delay & disruption, construction defects, professional practice and damages. \n Our professionals support attorneys, contractors, owners, public agencies and other stakeholders in some of the nation's most challenging construction disputes. Team members are located across the country and generally work remotely from their home offices with occasional travel for site inspections, meetings, depositions, and testimony. \n \n Qualifications \n Qualified candidates should possess: \n \n Bachelor’s degree in Engineering, Construction Management, Construction Engineering, or a related discipline \n 20+ years of experience in construction scheduling and project controls \n Extensive experience developing and managing Critical Path Method (CPM) schedules \n Advanced proficiency with Primavera P6 \n Experience performing forensic schedule analysis, delay analysis, time impact analysis, and productivity assessments \n Strong technical writing and communication skills \n Expert witness, deposition, or trial testimony experience is preferred but not required \n Professional certifications such as PSP, PMI-SP, PMP, PE, or CCM are a plus \n \n \n Compensation \n This is an independent contractor position. \n Compensation ranges from $150 to $250 per hour, depending on qualifications, experience, and project requirements. \n \n Travel \n Occasional travel may be required for: \n \n Site inspections \n Client meetings \n Depositions \n Mediation and arbitration \n Trial testimony \n \n \n If you are a seasoned scheduling or project controls professional seeking intellectually challenging work that leverages your technical expertise, we'd welcome the opportunity to speak with you. \n \n

Loading
Please wait..!!