Skip to main content
Loading
loadingbar
Loading, Please wait..!!

Electrical Engineer - Power Systems Design

  • Electrical Engineer - Power Systems Design job type Posted on: Nov 15, 2026
  • Electrical Engineer - Power Systems Design experience level Frontier Power USA
  • Electrical Engineer - Power Systems Design employment type Waterbury, Vermont
  • Electrical Engineer - Power Systems Design employment type Onsite
  • Electrical Engineer - Power Systems Design salary Full-time

Point Apply Here APPLY LATER

Curious about compensation?

Explore the historical salary trends, average pay, and estimated compensation for Electrical Engineer - Power Systems Design roles in Vermont.

View Salary Guide →

Job Title :

Electrical Engineer - Power Systems Design

Job Type :

Full-Time

Job Location :

Waterbury Vermont United States

Remote :

No

Jobcon Logo Job Description :

Job Description

Job Description
What You'll Do\n
\n
\n
    \n
  • \n

    Develop one-line and three-line diagrams, AC/DC schematics, and MV/LV distribution designs for BESS, microgrid, generation, and data-center power projects.

  • \n
\n
\n
\n
    \n
  • \n

    Size conductors, conduit, raceway, transformers, switchgear, and protective devices; prepare grounding designs and cable schedules.

  • \n
\n
\n
\n
    \n
  • \n

    Prepare equipment layouts, site electrical plans, and installation details with the CAD team.

  • \n
\n
\n
\n
    \n
  • \n

    Write equipment specifications and review OEM submittals (PCS, batteries, switchgear, transformers, relays, meters).

  • \n
\n
\n
\n
    \n
  • \n

    Develop design packages through 30/60/90% reviews to IFC, and maintain them through as-built.

  • \n
\n
\n
\n
    \n
  • \n

    Perform or support load flow, short-circuit, arc-flash, and ampacity calculations.

  • \n
\n
\n
\n
    \n
  • \n

    Respond to RFIs, review contractor submittals, and support construction, energization, and commissioning.

  • \n
\n
\n
\n
    \n
  • \n

    Support utility interconnection applications and AHJ permit submittals.

  • \n
\n
\n
\n
    \n
  • \n

    Apply FPUSA design standards, checklists, and QA/QC procedures, and help improve them.

  • \n
\n
\n
What We're Looking For\n
\n
\n
    \n
  • \n

    Bachelor’s degree in Electrical Engineering.

  • \n
\n
\n
\n
    \n
  • \n

    Engineer I/II: 2–6 years of electrical design experience; EIT/FE certification. Senior: 7+ years and an active PE license (Pennsylvania or Vermont, or able to obtain by comity).

  • \n
\n
\n
\n
    \n
  • \n

    Experience designing BESS, solar, microgrid, distributed generation, substation, industrial, or critical-power systems.

  • \n
\n
\n
\n
    \n
  • \n

    Working knowledge of NEC (including Articles 690, 705 and 706), NESC, NFPA 70E, NFPA 855, UL 9540, and IEEE standards.

  • \n
\n
\n
\n
    \n
  • \n

    Ability to produce clear, constructible drawings and calculations, with attention to detail.

  • \n
\n
\n
\n
    \n
  • \n

    Proficiency with AutoCAD (or AutoCAD Electrical) and Bluebeam.

  • \n
\n
\n
\n
    \n
  • \n

    Ability to travel to project sites for walkdowns, construction support, and commissioning.

  • \n
\n
\n
Preferred Qualifications\n
\n
\n
    \n
  • \n

    Medium-voltage (up to 35 kV) design and collector-system experience.

  • \n
\n
\n
\n
    \n
  • \n

    Experience with ETAP, SKM, or EasyPower.

  • \n
\n
\n
\n
    \n
  • \n

    Familiarity with BESS controls (EMS/PPC), SCADA, and communications (Modbus, DNP3).

  • \n
\n
\n
\n
    \n
  • \n

    Experience with ISO-NE, NYISO, or PJM interconnection requirements.

  • \n
\n
\n
\n
    \n
  • \n

    Federal or DoD project experience (UFC criteria, USACE submittals).

  • \n
\n
\n
\n

We may use artificial intelligence (AI) tools to support parts of the hiring process, such as reviewing applications, analyzing resumes, or assessing responses and identifying potential inconsistencies or verification signals in application materials based on available information. These tools assist our recruitment team but do not replace human judgment. Final hiring decisions are ultimately made by humans. If you would like more information about how your data is processed, please contact us.

Jobcon Logo Position Details

Posted:

Nov 15, 2026

Reference Number:

84812827

Employment:

Full-time

City:

Waterbury

Job Origin:

ziprecruiter

Share this job:

  • linkedin

Jobcon Logo
A job sourcing event
In Dallas Fort Worth
Aug 19, 2017 9am-6pm
All job seekers welcome!

Electrical Engineer - Power Systems Design    Apply

Click on the below icons to share this job to Linkedin, Twitter!

Job Description

Job Description
What You'll Do\n
\n
\n
    \n
  • \n

    Develop one-line and three-line diagrams, AC/DC schematics, and MV/LV distribution designs for BESS, microgrid, generation, and data-center power projects.

  • \n
\n
\n
\n
    \n
  • \n

    Size conductors, conduit, raceway, transformers, switchgear, and protective devices; prepare grounding designs and cable schedules.

  • \n
\n
\n
\n
    \n
  • \n

    Prepare equipment layouts, site electrical plans, and installation details with the CAD team.

  • \n
\n
\n
\n
    \n
  • \n

    Write equipment specifications and review OEM submittals (PCS, batteries, switchgear, transformers, relays, meters).

  • \n
\n
\n
\n
    \n
  • \n

    Develop design packages through 30/60/90% reviews to IFC, and maintain them through as-built.

  • \n
\n
\n
\n
    \n
  • \n

    Perform or support load flow, short-circuit, arc-flash, and ampacity calculations.

  • \n
\n
\n
\n
    \n
  • \n

    Respond to RFIs, review contractor submittals, and support construction, energization, and commissioning.

  • \n
\n
\n
\n
    \n
  • \n

    Support utility interconnection applications and AHJ permit submittals.

  • \n
\n
\n
\n
    \n
  • \n

    Apply FPUSA design standards, checklists, and QA/QC procedures, and help improve them.

  • \n
\n
\n
What We're Looking For\n
\n
\n
    \n
  • \n

    Bachelor’s degree in Electrical Engineering.

  • \n
\n
\n
\n
    \n
  • \n

    Engineer I/II: 2–6 years of electrical design experience; EIT/FE certification. Senior: 7+ years and an active PE license (Pennsylvania or Vermont, or able to obtain by comity).

  • \n
\n
\n
\n
    \n
  • \n

    Experience designing BESS, solar, microgrid, distributed generation, substation, industrial, or critical-power systems.

  • \n
\n
\n
\n
    \n
  • \n

    Working knowledge of NEC (including Articles 690, 705 and 706), NESC, NFPA 70E, NFPA 855, UL 9540, and IEEE standards.

  • \n
\n
\n
\n
    \n
  • \n

    Ability to produce clear, constructible drawings and calculations, with attention to detail.

  • \n
\n
\n
\n
    \n
  • \n

    Proficiency with AutoCAD (or AutoCAD Electrical) and Bluebeam.

  • \n
\n
\n
\n
    \n
  • \n

    Ability to travel to project sites for walkdowns, construction support, and commissioning.

  • \n
\n
\n
Preferred Qualifications\n
\n
\n
    \n
  • \n

    Medium-voltage (up to 35 kV) design and collector-system experience.

  • \n
\n
\n
\n
    \n
  • \n

    Experience with ETAP, SKM, or EasyPower.

  • \n
\n
\n
\n
    \n
  • \n

    Familiarity with BESS controls (EMS/PPC), SCADA, and communications (Modbus, DNP3).

  • \n
\n
\n
\n
    \n
  • \n

    Experience with ISO-NE, NYISO, or PJM interconnection requirements.

  • \n
\n
\n
\n
    \n
  • \n

    Federal or DoD project experience (UFC criteria, USACE submittals).

  • \n
\n
\n
\n

We may use artificial intelligence (AI) tools to support parts of the hiring process, such as reviewing applications, analyzing resumes, or assessing responses and identifying potential inconsistencies or verification signals in application materials based on available information. These tools assist our recruitment team but do not replace human judgment. Final hiring decisions are ultimately made by humans. If you would like more information about how your data is processed, please contact us.

Loading
Please wait..!!